When the Ngunguru Wastewater Treatment Plant, Paneltech provided a cost effective and long lasting solution.
Paneltech was identified as the preferred contractor for erecting the laminated veneer lumber to relocate the Blister Hangar at MOTAT
When Northport required 7000m2 reinforced concrete pad for the storage of woodchip, Paneltech were there to deliver a product of the highest quality on time and on budget.
An upgrade to the Hatea Sewer Pump Station and the construction of a large emergency storage tank at this location was designed and engineered to minimise overflows.